The Dam: At the time of construction, Hoover Dam was the largest in the world and although long since surpassed it is still an amazing structure and a marvel of engineering - a huge, curving wall of plain concrete 660 feet thick at the base and 726 feet high set between the vertical walls of Black Canyon, accompanied by strangely-angled pylons, cables, power generating plants and other machinery. In 1955, the dam was selected as one of the Seven Modern Engineering Wonders in the USA by the American Society of Civil Engineers, and it is was later designated a National Historic Landmark.
This dam, located 30 miles (48 km) southeast of Las Vegas, Nevada, is named after Herbert Hoover,
Lake Mead is the reservoir created behind the dam, named after Elwood Mead, who oversaw the construction of the dam.
Planning and agreements
A commission was formed in 1922 with a representative from each of the Basin states and one from the Federal Government. The federal representative was Herbert Hoover, then Secretary of Commerce under President Warren Harding. In January 1922, Hoover met with the state governors of Arizona, California, Colorado, Nevada, New Mexico, Utah, and Wyoming to work out an equitable arrangement for apportioning the waters of the Colorado River for their states' use. The resulting Colorado River Compact, signed on November 24, 1922, split the river basin into upper and lower halves with the states within each region deciding how the water would be divided. This agreement, known as the Hoover Compromise, paved the way for the Boulder Dam Project. This huge dam was built to help keep the silt and sediment out of the Colorado River, for flood control, and for hydroelectric-power generation
Power plant The hydroelectric generators at Hoover dam Following an uprating project from 1986 to 1993, the total gross power rating for the plant, including two 2.4 megawatt generators that power the plant's operations, is about 2080 megawatts.Excavation for the powerhouse was carried out simultaneously with the excavation for the dam foundation and abutments. Excavation for the U-shaped structure located at the downstream toe of the dam was completed in late 1933 with the first concrete placed in November 1933.

0 Diskusi:
Post a Comment